Our References
Recent Major SAP Projects:
AVE Ltd. (Industry: Utility)
- Continuous technical support
- Deployment of Board Computer
DRV (Industry: Utility)
- Long term support (4 years) of SAP core, HR and IS-U modules
ExxonMobil (Industry: Oil)
- SAP XI development and support
- SAP ABAP development and support
GE C&I Europe (Industry: Manufacturing)
- Deployment of Preference Calculation
TIGÁZ (Industry: Utility)
- Free-market product line implementation
References:
ECOLAB - SAP ECC 6.0 roll-out (2009-2010)
Industry: Manufacturing
Project type: |
| Rollout of SAP 6.0 ERP system based on Ecolab Belgium company implementation. |
Project description: |
- Sales, production and logistics processes with implementation
- Implementing E-Business and EDI ordering and invoicing solutions for the Nordic countries
- Key user training
- Preparation of data migration
- Implementation of SAP APO Demand and SNP Planning
|
Project details: |
- Realised modules:
- FI (Financial Accounting)
- AM (Asset Accounting)
- CO (Controlling)
- SD (Sales and Distribution)
- MM (Materials Management)
- WM (Warehouse Management)
- PP (Production Planning)
- QM (Quality Management)
- APO (Advanced Planner and Optimizer)
- Project scope: 4 countries (Denmark, Sweden, Norway and Finland)
- Duration of the project: 2009-2010
|
Lupus Consulting - Implementation of SAP All-in-One (2010)
Industry: IT Consulting
Project type: |
| Implementation of own ERP system - SAP All-in-One. |
Project description: |
- Implementation of SAP core modules
|
Project details: |
- Number of Users: 6 Pers.
- Realised modules:
- FI (Financial Accounting)
- AM (Asset Accounting)
- CO (Controlling)
- SD (Sales and Distribution)
- MM (Materials Management)
- Duration of the project: 3 months
|
GE C&I Europe - Implementation of SAP APO DP and SNP (Ramp-up) (2009-2010)
Industry: Manufacturing
Project type: |
| SAP APO 7.0 Safety Stock and Demand Planning Implementation (Ramp-up). |
Project description: |
- Business Unit wide project at GE C&I
- Changing from Manugistics to SAP APO 7.0 (ramp-up project)
- Strong cooperation with SAP Labs
- Master data and transaction data synchronization with SAP R/3
- Safety Stock Level Planning based on demand forecast
- Measurable raise in forecast accuracy compared to the legacy system
- Custom planning logic by Advanced Macros
- 100% standard solutions
- Process automation with Process Chains
- Custom authorization rules for planners of different fields
|
Project details: |
- Number of Users: > 70 pers.
- Realised modules:
- Duration of the project: 2009-2010
|
GE C&I Europe - Support and functional extensions (2008-2009)
Industry: Manufacturing
Project type: |
| XI and ABAP development (Supplier Collaboration Tool) web based application connected to SAP Systems (4.7, and 3.1 I versions) through XI (3.0) Prototype development in PI 7.0. |
Project description: |
- XI development
- Developing grapchical mapping with user defined java functions
- IDOC interfaces on ABAP side
- BPM implementation
- Workflow monitoring in XI Process Engine
- Creating training material about Process Monitoring in SAP Business Workflow environment
- Technical configuration of XI system
- Inbound processing routines for IDOCs
- Technical management
- Monitoring, error analysis
|
Project details: |
- Number of Users: ca. 1200 pers
- Realised modules:
- FI (Financial Accounting)
- SD (Sales and Distribution)
- MM (Materials Management)
- Duration of the project: 6 months
|
ELMŰ - SAP IS-U Implementation (2009)
Industry: Utility
Project type: |
| Implementation - Current SAP release: 4.6C Target release: ECC 6.0 |
Project description: |
- SAP installation
- SAP support package and enhancement package implementation
- Platform: IBM AIX / Oracle.
- Contact between customer and implementation team
|
Details: |
- Number of Users: 1400 pers
- Realised modules:
- Duration of the project: 2009
|
STI Printing House - Roll-out (2009)
Industry: Printing and Packaging
Project type: |
| Roll-out of SAP 5.0 ERP system based on STI Germany company implementation |
Project description: |
- Sales process, production process and production data management implementation including document management and variant configuration for make-to-order production.
- Material management process roll-out including material requirement planning, purchasing processes and stock take process.
- Quality management process with QM implementation including: incoming material quality inspection and production goods receipt quality inspection.
- Ensuring integration among FI, AM, CO and logistic modules
- Key user trainings preparation and execution in PP, QM, MM, WM and SD modules.
- Preparation of data migration from the old system to SAP in PP, QM, MM, WM and SD modules.
|
Details: |
- Number of Users: 100 pers.
- Realised modules:
- FI (Financial Accounting)
- AM (Asset Accounting)
- CO (Controlling)
- SD (Sales and Distribution)
- MM (Materials Management)
- WM (Warehouse Management)
- PP (Production Planning)
- QM (Quality Management)
- Duration of the project: 2009
|
AVE - Implementation of SAP IS-U and Waste and Recycling modules (2008-2009)
Industry: Utility
Project type: |
| Implementation of SAP R/3 and IS-U for waste and recycling companies. |
Project description: |
- Delivery of a solution for 3 Hungarian AVE companies with Synergon.
- Realization of a complete system integration with the implementation of SAP Waste and Recycling module delivered by PROLOGA.
- Creating the necessary programming.
- Realization of complete data migration from source systems.
|
Project details: |
- Number of users: 150
- Realized modules:
- FI (Financial Accounting)
- SD (Sales and Distribution)
- MM (Materials Management)
- DMS (Document Management System)
- IS-U (Waste and Recycling)
- Duration of project: 2008 - 2009
- Project Scope: 8 companies
|
Volksbank - SAP R/3 Roll-out (2008-2009)
Industry: Banking
Project type: |
| SAP R/3 Roll-out for Volksbank Hungary |
Project description: |
- Data migration from the Legacy system
- Implementation of FI, CO, SD (invoicing) functionalities according to Volksbank global template
- Implementation of country specific functionalities, VAT handling, Fixed Assets
- Customizing, developments
|
Details: |
- Number of Users: 50 pers.
- Realised modules:
- FI (Financial Accounting)
- CO (Controlling)
- SD (Sales and Distribution)
- Duration of the project: 2008 - 2009
|
TIGAZ - SAP IS-U extension (2008)
Industry: Utility
Project type: |
| SAP R/3 IS-U module extension according to the gas retail market deregulation. |
Project description: |
- Reengineer the meter reading organization, invoicing and billing processes according to the new regulation.
- Creating the BI master data.
- Plan and deliver developments and customizing.
|
Project details: |
- Number of users: 500
- Realized modules:
- IS-U (Utilities Industry)
- Duration of project: 2008
|
ELMŰ - SAP IS-U module extension (2007-2008)
Industry: Utility
Project type: |
| SAP R/3 IS-U module extension according to the electricity retail market deregulation. |
Project description: |
- Reengineering of the meter reading organization, invoicing and billing processes according to new regulations.
- Creating the BI master data.
- Plan and deliver developments and customizing.
|
Project details: |
- Number of users: 200
- Realized modules:
- IS-U (Utilities Industry)
- Duration of project: 2007 - 2008
|
Tenneco - Support of European SAP systems (2006-2008)
Industry: Automotive
Project type: |
| Support of European SAP Systems of Tenneco Automotive and system extension (Material Ledger, VMI, Self-Billing). |
Project description: |
- Implementation of future price calculation methodology based on planned value changes for specific parameters.
- Classification based release strategies in purchasing document flow.
- Implementation of Material Ledger in the European region (11 countries).
|
Project details: |
- Special statistical conditions defined based on condition tables for purchasing documents and info records
to determine price changes for the next year and calculate with the values only in costing.
- 4 level release strategies defined for purchase requisition release and for purchase order release flow based on 8 classification objects.
Release code changes and prerequisites are defined based on the characteristic values.
|
More details: |
- Number of users: 1500
- Realized modules:
- SD (Sales and Distribution)
- MM (Materials Management)
- Project extension: 15 countries
- Duration of the project: 2006 - 2008
|
ISD DUNAFERR - SAP R/3 PP, QM module implementation (2006-2007)
Industry: Heavy Industry
Project type: |
| SAP R/3 PP, QM module implementation. |
Project description: |
- Replacement of 18 years old production planning and quality check system (Sapiens based).
- Development of the communication with process management systems.
|
Project details: |
- Number of users: 1500
- Extension of the recent SAP system functionality with the PP (Production Planning) and QM (Quality Management) modules.
- Integrate 4 subsidiaries into the Group R/3 system.
- Configuration and batch classified production of finished and semi-finished products.
- On-line interfaces between SAP MM (Material Management), PP (Production Planning) and QM (Quality Management) modules and external operation systems of the production machines.
|
GE Lighting Europe - Implementation of SAP R/3 (2004-2006)
Industry: Manufacturing
Project type: |
| SAP R/3 implementation. |
Project description: |
- Delivery of a solution extended to all countries and organizational units of GE Lighting Europe.
- Reorganization and reimplementation of the business processes supported by SAP R/2 system, implemented in 1989, in the new R/3 environment.
- Realization of complete system integration with the implementation of XI, the middleware module of SAP.
- Realization of complete data migration included historical data from R/2 system and other source systems.
|
Project details: |
- Number of users: 3000
- Realized modules:
- FI (Financial Accounting)
- SD (Sales and Distribution)
- MM (Materials Management)
- Duration of the project: 2004 - 2006
- Extension of the project: 23 countries
|
DUNAFERR - SAP R/3 implementation (2003-2004)
Industry: Heavy Industry
Project type: |
| Implementation of SAP R/3. |
Project description: |
- Replacement of SAP R/2 by SAP R/3 with FI, AM, CO, MM, SD, WM modules.
- Replacement of legacy systems in the field of materials management.
- Design the R/3 solution according to the new business operation model.
|
Project details: |
- Number of Users: 750
- Take over master data and open items from R/2 system.
- Develop custom migration objects.
- Develop interfaces to third party production planning system.
- Customizing of the SAP R/3 applications.
- Design hardware infrastructure, which serves the R/3 based solution.
|
Makedonski Telekommunikacii - Implementation of SAP CO-ABC (2006-2007)
Industry: Telecommunication
Project type: |
| Implementation of SAP CO-ABC (activity based costing). |
Project description: |
- Realization of the activity based costing logic and structures with SAP R/3 system.
- Ensuring model manageability and model credibility.
- Realization of the different cost allocation streams for the activities and depreciation costs, based on lead times and capability.
- Realization of the integration between SAP CO-ABC and CO-PA.
- Realization of product level contribution margin in CO-PA.
|
Project details: |
- Number of Users: 15
- Realized CO submodules:
- CO-OM-CCA (Cost Centre Management)
- CO-ABC (Activity based costing)
- CO-PA (Profitability analysis
- Duration of the project : 2005 - 2007
|
Makedonski Telekommunikacii - Implementation of interconnect invoicing system (2005-2006)
Industry: Telecommunication
Project type: |
| Implementation of Interconnect invoicing system and integration of it with SAP system in consortium with Daten-Kontor. |
Project description: |
- Realization of the invoicing and revenue management processes related to Interconnect like services supported by the working SAP R/3 system.
- Realization of complete system integration between SAP and ICBS systems.
|
Project details: |
- Number of Users: 700
- Realized modules:
- FI (Financial Accounting)
- SD (Sales and Distribution)
- MM (Materials Management)
- Duration of the project : 2005 - 2006
|
INVITEL - First Hungarian SAP IS-T implementation (2004-2005)
Industry: Telecommunication
Project type: |
| First Hungarian SAP IS-Telecommunication implementation. |
Project description: |
- Implementation of SAP IS-Telecommunication package for the support of the contract-account management.
- Realization of complete data migration from the legacy invoicing, account management nad master data manager systems.
- Realization of system integration between SAP and joint systems with the help of developed management tools.
|
Project details: |
- Number of Users: 250
- Realized modules:
- Duration of the project: 2004 - 2005
|